Sidewalk shed

Sidewalk Sheds

Sidewalk Shed Post Installation Inspection to provide 3rd party verification of safety standard adherence by checking for the following:


  • Legs are attached to mudsills and are stationary from outside forces
  • Legs and poles are plump, braced and have caps on exposed bolt faces below 4ft in height
  • Cross braces are fully connected, not bent, damaged or missing.
  • Pipe clamps are tight on both sides
  • Bridge decking is secured from motion and no holes are present
  • Bridge is clear of debris and loose material
  • Parapet has signage, proper height and secured · Lights are working and spaced properly for public safety
  • Monitor the process while the bridge is assembled to point out safety violations due to worker negligence resulting in hefty DoB and OSHA fines. 


  • Sidewalk Shed independent post installation inspection  - $250 per hour per each 100’ linear feet. 
  •  Inspection to be done by and ( PE) Profesional Engineer -  $500.00 per hour up to 100’ Linear feet 
Order Here

Sidewalk Bridge Leg

Sidewalk Bridge Girts & Brace

Sidewalk Bridge Clamps

Panel Brackets

Sidewalk Bridge Leg

Share by: